Excerpts from Title 24 Part 6

Section 150.1 excerpts below are from the 2022 Building Energy Efficiency Standards [PDF]

Prescriptive Requirement Changes for Photovoltaic and Battery Storage and Solar, Electric and Battery Ready

[A prescriptive requirement is required when using the "Prescriptive Compliance Path" to meet the energy code. Prescriptive requirements can be traded away with other energy features using the Performance Compliance Path" to meet the energy code.]

Revised: Photovoltaic System Requirements

Clarifications are made to help determine a building's solar access roof area in order to calculate the minimum photovoltaic system kW requirements and determine if a project is eligible for an exception.

Note the revised exceptions.

The annual electrical output of a newly installed photovoltaic (PV) system and modules must be no less than the smaller of a PV system size determined using Equation 150.1-C, or the maximum PV system size that can be installed on the building's Solar Access Roof Area (SARA) meeting the minimum qualification requirements of JA11.

  1. SARA includes the area of the building's roof space capable of structurally supporting a PV system and the area of all roof space on covered parking areas, carports and all other newly constructed structures on the site that are compatible with supporting a PV system per California Building Code §1511.2.
  2. SARA does NOT include:

    1. Any roof area that has <70% annual solar access. Annual solar access is determined by dividing the total annual solar insolation, accounting for shading obstructions, by the total annual solar insolation if the same areas were unshaded by obstructions. For steep-slope roofs, only shading from existing permanent natural or manmade obstructions that are external to the dwelling, including but not limited to trees, hills and adjacent structures, must be considered for annual solar access calculations. For low-slope roofs, all obstructions including those that are external to the dwelling unit, and obstructions that are part of the building design and elevation features must be considered for the annual solar access calculations.
    2. Occupied roof areas are specified by California Building Code §503.1.4.
    3. Roof area that is otherwise not available due to compliance with other building code requirements if confirmed by the California Energy Commission Executive Director.

Exceptions:

  1. Steep-sloped Roofs: SARA must not consider roof areas with a northerly azimuth that lies between 300 degrees and 90 degrees from true north. No PV system is required if the SARA is <80 contiguous ft².
  2. Minimum PV System Size Specified by §150.0(c)14 <1.8 kWdc: No PV system is required.
  3. Snow Loads: Buildings with enforcement authority-approved roof designs, where the enforcement authority determines it is not possible for the PV system, including panels, modules and components and supports and attachments to the roof structure, to meet the requirements of the American Society of Civil Engineers (ASCE), Standard 7-16, Chapter 7, Snow Loads.
  4. Reduced PV kW in Subdivisions: For buildings that are approved by the local planning department prior to January 1, 2020, with mandatory conditions for approval in which shading from roof designs and configurations for steep-sloped roofs and roof areas that are not allowed to have PVs required by the mandatory conditions for approval, must not be considered in determining the SARA.
  5. Reduced PV kW with Battery Storage Systems: PV system sizes that are determined using Equation 150.1-C may be reduced by 25% if installed in conjunction with a battery storage system. The battery storage system must meet the qualification requirements specified in Reference Joint Appendix JA12 and minimum usable capacity of ≤?7.5 kWh.

Conclusions About the New PV Solar Sections of Title 24 Part 6 Energy Code


Proving the Exemption for PV Solar

  1. Determine the building's Solar Access Roof Area (SARA)

    Contact a company that utilizes one of the CEC approved software tools for PV Solar Analysis. A list of CEC approved software providers is included below.

  2. Show the Exemption on the CF-1R Energy Report for Building Department Review

    Send the PV Solar Shading Analysis report to Title 24 Part 6 Energy Services or the original CF-1R documentation author. The PV Solar Shading Analysis Report will then be reviewed for possible PV Solar Exemptions.

    If a re-calculation of the CF-1R Energy Report is needed, please expect a revision fee.

What Solar Assessment Tools are Approved?

CEC has approved the following solar assessment tools for use as specified in JA11.4(a):

What is required for CF2R Solar Access Verification?

A Certificate of Installation for Photovoltaic system (CF2R-PVB-01-E) requires a solar assessment report completed by a CEC-approved solar assessment tool (see above).

In addition, the satellite, drone or other digital image used in the solar assessment report must meet one of the following conditions: